8
|
||||||||||||||||||||||||
1
|
11
|
5
|
2
|
4,10
|
||||||||||||||||||||
6
|
9
|
|||||||||||||||||||||||
7
|
||||||||||||||||||||||||
12
|
||||||||||||||||||||||||
3
|
||||||||||||||||||||||||
Six Sigma Crossword
Rows:
1.What are the sources of customer's dissatisfaction and poor business performance?
3. A set of principles and tools that help us to eliminate process activities that don't add value and to create "flow".
6. A proven methodology for evaluation is called ___________.
10. ___________________ = Specification width/process width.
12. A measure of probability that a particular failure will actually happen is called____________.
Columns:
2. A collection of methods and tools aimed at the significant reduction of unwanted variation in products and processes.
4. In DMAIC methodology, "C" stands for________.
5. CTQ stands for ____________.
7. Which flow chart symbol represents a process path one flow?
8. ___________ causes long lead times, risk of absolete stock, discounting excess items.
9. ____________ is also known as test/ re-test error.
11.____________ is a structured method to identify failure modes, determine the severity of failure etc.
No comments:
Post a Comment